top of page
Search

How much does an architect cost in Luxembourg? Fees and real budgets

Nov 5
2 min read

Updated: Nov 14

It is often the first question, and it deserves a straight answer. In Luxembourg, the cost of an architect depends on the nature of the project, its complexity and the scope of the assignment. Here are the figures we see on our own projects, from Bertrange and across the country.

Fees between 7.5% and 15% of construction costs

Architects' fees in Luxembourg are not regulated: since 2024, the Order of Architects and Consulting Engineers (OAI) no longer publishes a fee scale. In practice, fees generally range from 7.5% to 15% of construction costs.

The percentage depends on three factors:

  • the type of project: a new build, a heavy renovation or a transformation in a protected area do not require the same work;

  • complexity: an old building, a constrained plot or a bespoke brief call for more studies;

  • the scope of the assignment: you can entrust the full assignment, from first sketch to final handover, or only certain stages.

At TRIBE Architects, fees are set in writing from the outset, stage by stage. You know what is included, what is not, and when each amount is due.

What the fees cover

A full assignment covers design, the building permit application, contractor tendering, then site coordination and supervision through to handover and the snagging list. One single point of contact, from the first sketch to the keys.

What budget should you plan for the works?

Fees are only part of the equation. These are the construction budgets we observe, excluding fees and VAT:

  • Full renovation of a 1980s house (attic conversion, dormers, insulation, windows, façades, finishes): €600,000 to €700,000, almost every time.

  • From one million euros, starting again with a new build often becomes possible.

  • A bespoke architect-designed house: from €2.3 million.

We set no minimum budget: our renovations generally start at around €250,000.

Costs on top of the architect's fees

  • surveyor: survey, setting out, boundary marking, vertical cadastre;

  • structural engineer: structure, load-bearing walls, slabs, underpinning;

  • building services engineer: heating, ventilation, plumbing, electrics;

  • approved energy adviser: energy performance certificate, grants;

  • soil survey, health and safety coordinator, condition survey of neighbouring buildings;

  • utility connections, municipal taxes and insurance.

For renovations, we also recommend a contingency of around 10% of construction costs.

Costing before the permit, not after

The real question is not only what the architect costs, but how reliable the overall budget is. We cost every project item by item at the preliminary design stage, before the permit application and before tendering, and we update our estimates every year using the STATEC construction price index. Major decisions are made with full knowledge, not after discovering a budget gap.

For permits, grants and the vertical cadastre, see our FAQ.

Planning a project? Write to us: we review your file, answer your questions within the week and place your project within these ranges. A site visit is charged €340 excl. VAT: it includes a first sketch, preliminary checks with the municipality and a contract proposal, and the amount is fully deducted from our fee if you entrust us with your project. Book an appointment.

 
 
 

Recent Posts

See All

Comments


Commenting on this post isn't available anymore. Contact the site owner for more info.
bottom of page