ARCHITECTURE PROJECTS IN LUXEMBOURG
VILLA IN THE TERRACES — MOSELLE VALLEY (DESIGN STUDY)
A new house set into the vineyard terraces above the Luxembourg Moselle. The project steps down with the slope: dry-stone walls taken from the old terraces, green roofs that extend the hillside, large glazed openings and an infinity pool facing the valley. Project under study: the views shown are design images, not photographs.

HEAVY RENOVATION — PFAFFENTHAL, LUXEMBOURG
A house spanning three periods (around 1700, the 19th century and the mid-20th century), in a protected area within the UNESCO World Heritage buffer zone. Basement and façades rebuilt; the conservatory replaced by an orangery in hand-cut insulating masonry, laid like dressed stone. Budget of around €600,000 (construction cost, excluding fees and VAT).

RESIDENTIAL DEVELOPMENT IN PROGRESS — GASPERICH, LUXEMBOURG (2026–2027)
Demolition of a single-family house and construction of a five-apartment building, budget of around €1.5 million. TRIBE Architects’ mission: amended building permit and project management through to handover.

RENOVATION AND EXTENSION OF A HOLIDAY HOME — OIZY, BELGIUM (2024)

EXTENSION AND RENOVATION IN PROGRESS — SAINT-MARD, BELGIUM

EXTENSION PROPOSAL — DAARA IN MALIKA, DAKAR, SENEGAL (2015)
Extension of a daara, a Koranic school that houses and cares for children, on the edge of one of the largest open-air landfills in Africa. The existing children's rooms, canteen and mosque are retained and the administration building is renovated. Around a main courtyard, the extension adds staff and volunteer housing, kitchens, a laundry and washrooms. On the street side, a building open to the neighbourhood brings together an internet café, a homework room, a library and a first-floor meeting room; a cooperative storehouse and workshops and a market garden complete the programme. The project relies on salvaged materials and optimised concrete, for minimal maintenance. The mashrabiya screens are made on site from salvaged terracotta: mixed rubble, crushed and reconditioned. The building site also serves to train young people from the neighbourhood. A collaborative, bottom-up project. A prototype classroom was developed as a model.












































