
WHY TRIBE ARCHITECTS
First meeting free of charge — We visit your property and listen to your project, without obligation. At a second meeting, we present a clear and detailed proposal.
Tight cost control — Detailed estimates from the preliminary design stage, before the permit application: you know your budget before you commit.
Realistic timescales — A building permit is usually obtained within two to three months. Time is mostly saved in a rigorous preparation phase, which we carry out with care.
Energy subsidies — From the design stage, we build in the energy renovation grants (Klimabonus) to optimise the financing of your project.
A network of exceptional craftsmen — Stonemasons, carpenters and other master craftsmen share our attention to detail.
One point of contact — The architect who designs your project follows it through to handover.